Our elevated GRP cable troughing ARCOSYSTEM® is proving to be a reliable and cost-effective choice as work on the major Transpennine Route Upgrade East project takes shape.

Enquire now about high-end composite designs and installations for your application: +44 1462 659 876 info@completecomposites.co.uk
Our elevated GRP cable troughing ARCOSYSTEM® is proving to be a reliable and cost-effective choice as work on the major Transpennine Route Upgrade East project takes shape.
The flexibility and size ranges of our ARCOSYSTEM® cable troughing were on full display during two recent trackside installations in Germany.
Our innovative cable troughing ARCOSYSTEM® was successfully fixed to a trackside rock wall during a challenging installation.
Some recent installations showed how our GRP elevated cable troughing ARCOSYSTEM® can be securely attached to trackside noise barriers.
Our elevated cable troughing ARCOSYSTEM® was expertly installed at some challenging trackside locations in Austria.
The specialist narrower version of our cable management product ARCOSYSTEM® was the ideal solution for a space-constricted job in a soaring setting.
Our adjustable cable management product ARCOSYSTEM® proved it can be successfully attached to a range of bridges during a group of recent challenging installations.
The dexterity and adaptability of our elevated cable management system ARCOSYSTEM® was put to the test during a recent installation in the German town of Gössnitz.
Our eco-friendly post-mix product TECHNO-CRETE® has made a significant contribution to a low-carbon, sustainable energy project on the London Docklands Light Railway network.
The flexibility of our elevated cable management product ARCOSYSTEM® was clear for all to see during a recent installation across difficult terrain in Germany.