by Paul Gadsby | Aug 25, 2026 | ARCOsystem
We are delighted to see our ARCOSYSTEM® rail cable containment system featured in the new edition of Railway News magazine. This latest issue of the e-magazine is a special edition focusing on September’s InnoTrans exhibition in Berlin, with our triple-page article...
by Paul Gadsby | Dec 1, 2025 | ARCOsystem
An astute piece of technical planning allowed for the smooth fixing of our ARCOSYSTEM® rail cable troughing to a bridge during a testing trackside installation. The job took place near the town of Gammertingen in the state of Baden-Württemberg in southern Germany. The...
by Paul Gadsby | Nov 3, 2025 | ARCOsystem
The flexibility of ARCOSYSTEM®, our elevated composite cable management system, ensured a successful installation along difficult terrain beside the Danube river in Austria. The job was part of a sizeable rail infrastructure project at Grein an der Donau, a historic...
by Paul Gadsby | Oct 6, 2025 | ARCOsystem
A diverse range of bracketry helped attach a lengthy run of our GRP-made ARCOSYSTEM® cable containment system to a bridge. The project took place in the Austrian municipality of St. Georgen near Salzburg. As can be seen amongst the images below, the high railway...
by Paul Gadsby | Sep 1, 2025 | ARCOsystem
Some careful design and planning work allowed for a successful attachment of our ARCOSYSTEM® cable troughing to a steel railway bridge. The project took place on a lengthy bridge over the River Lesum near the city of Bremen in northern Germany. Following the...
by Paul Gadsby | Jul 15, 2025 | ARCOsystem
Our specially developed ClickFit bracketry helped ensure a successful outcome during a complicated installation of our ARCOSYSTEM® cable containment system. The job was to attach a run of the ARCO cable troughing to trackside noise barriers in the town of Friesenheim...
by Paul Gadsby | Jul 1, 2025 | ARCOsystem
Our elevated Rapid Route ARCOSYSTEM® design was the ideal choice during a cable troughing installation in a flood-prone area in Cornwall, England. As part of the £56.8m SRSA (South Rail Systems Alliance) Reliance Mid Cornwall Metro upgrades project, a section of rail...
by Paul Gadsby | Jun 3, 2025 | ARCOsystem
The ‘Rapid Route’ method of fixing our versatile ARCOSYSTEM® cable troughing solved a challenging embankment installation in Essex, England. The job, carried out by contractor J Murphy & Sons Ltd on behalf of Network Rail, took place at Beaulieu Park Railway...
by Paul Gadsby | Mar 3, 2025 | ARCOsystem
Our ARCOSYSTEM® elevated cable troughing proved both flexible and sturdy enough to stretch across the width of a river without having to be fixed to the bridge railing. The project took place in the town of Husum in northern Germany, close to the Denmark border....
by Paul Gadsby | Feb 17, 2025 | ARCOsystem
Multiple troughs of our versatile cable containment product ARCOSYSTEM® were stacked vertically to meet the demanding cable-load requirements for a recent installation in Berlin. The job took place in the area of Pölnitzweg, based in the Pankow district of the German...
by Paul Gadsby | Oct 1, 2024 | ARCOsystem
Newly designed ‘ClickFit’ brackets were used to successfully attach our ARCOSYSTEM® elevated cable troughing to a sloping rock face during a challenging installation. The job was to install 500 metres of the GRP-constructed ARCOSYSTEM® along an angled rock face near...
by Paul Gadsby | Sep 16, 2024 | ARCOsystem
Our ARCOSYSTEM® elevated cable troughing was successfully installed in order to power Track Paralleling Huts during a rail project in the south east of England. Earlier this year, AW Rail Services Ltd were contracted to support ongoing works in the Sussex and Kent...
by Paul Gadsby | Sep 2, 2024 | ARCOsystem
Our cable containment product ARCOSYSTEM® was successfully installed along a highway bridge as part of an important reinforcement job in the Netherlands. The project took place on the A7 Neckerstraat bridge in the city of Purmerend to the north of Amsterdam. Size 2 of...
by Paul Gadsby | Aug 1, 2024 | ARCOsystem, case studies
The versatility of our rail cabling containment product ARCOSYSTEM® was put to the test when it was fitted down a steep incline within the dramatic setting of the Black Forest mountain range in Germany. The installation took place around the picturesque town of...
by Paul Gadsby | Jul 15, 2024 | ARCOsystem
The use of a bespoke bracket design helped solve an installation issue when our ARCOSYSTEM® cable containment system was clamped to a bridge in Germany. The project was on the line running from the Garmisch Partenkirchen ski resort in southern Germany to the village...
by Paul Gadsby | May 22, 2024 | ARCOsystem, case studies, Uncategorized
by Paul Gadsby | Jan 9, 2024 | ARCOsystem
by Paul Gadsby | Oct 17, 2023 | ARCOsystem
by Paul Gadsby | Aug 14, 2023 | ARCOsystem, case studies
by Paul Gadsby | Mar 6, 2023 | ARCOsystem