by Paul Gadsby | Dec 1, 2025 | ARCOsystem
An astute piece of technical planning allowed for the smooth fixing of our ARCOSYSTEM® rail cable troughing to a bridge during a testing trackside installation. The job took place near the town of Gammertingen in the state of Baden-Württemberg in southern Germany. The...
by Paul Gadsby | Nov 3, 2025 | ARCOsystem
The flexibility of ARCOSYSTEM®, our elevated composite cable management system, ensured a successful installation along difficult terrain beside the Danube river in Austria. The job was part of a sizeable rail infrastructure project at Grein an der Donau, a historic...
by Paul Gadsby | Oct 6, 2025 | ARCOsystem
A diverse range of bracketry helped attach a lengthy run of our GRP-made ARCOSYSTEM® cable containment system to a bridge. The project took place in the Austrian municipality of St. Georgen near Salzburg. As can be seen amongst the images below, the high railway...
by Paul Gadsby | Jul 15, 2025 | ARCOsystem
Our specially developed ClickFit bracketry helped ensure a successful outcome during a complicated installation of our ARCOSYSTEM® cable containment system. The job was to attach a run of the ARCO cable troughing to trackside noise barriers in the town of Friesenheim...
by Paul Gadsby | Feb 17, 2025 | ARCOsystem
Multiple troughs of our versatile cable containment product ARCOSYSTEM® were stacked vertically to meet the demanding cable-load requirements for a recent installation in Berlin. The job took place in the area of Pölnitzweg, based in the Pankow district of the German...
by Paul Gadsby | Oct 1, 2024 | ARCOsystem
Newly designed ‘ClickFit’ brackets were used to successfully attach our ARCOSYSTEM® elevated cable troughing to a sloping rock face during a challenging installation. The job was to install 500 metres of the GRP-constructed ARCOSYSTEM® along an angled rock face near...
by Paul Gadsby | Sep 16, 2024 | ARCOsystem
Our ARCOSYSTEM® elevated cable troughing was successfully installed in order to power Track Paralleling Huts during a rail project in the south east of England. Earlier this year, AW Rail Services Ltd were contracted to support ongoing works in the Sussex and Kent...
by Paul Gadsby | Sep 2, 2024 | ARCOsystem
Our cable containment product ARCOSYSTEM® was successfully installed along a highway bridge as part of an important reinforcement job in the Netherlands. The project took place on the A7 Neckerstraat bridge in the city of Purmerend to the north of Amsterdam. Size 2 of...
by Paul Gadsby | Aug 1, 2024 | ARCOsystem, case studies
The versatility of our rail cabling containment product ARCOSYSTEM® was put to the test when it was fitted down a steep incline within the dramatic setting of the Black Forest mountain range in Germany. The installation took place around the picturesque town of...