by Paul Gadsby | Jun 3, 2025 | ARCOsystem
The ‘Rapid Route’ method of fixing our versatile ARCOSYSTEM® cable troughing solved a challenging embankment installation in Essex, England. The job, carried out by contractor J Murphy & Sons Ltd on behalf of Network Rail, took place at Beaulieu Park Railway...
by Paul Gadsby | Mar 3, 2025 | ARCOsystem
Our ARCOSYSTEM® elevated cable troughing proved both flexible and sturdy enough to stretch across the width of a river without having to be fixed to the bridge railing. The project took place in the town of Husum in northern Germany, close to the Denmark border....
by Paul Gadsby | Jul 15, 2024 | ARCOsystem
The use of a bespoke bracket design helped solve an installation issue when our ARCOSYSTEM® cable containment system was clamped to a bridge in Germany. The project was on the line running from the Garmisch Partenkirchen ski resort in southern Germany to the village...