by Paul Gadsby | Oct 6, 2025 | ARCOsystem
A diverse range of bracketry helped attach a lengthy run of our GRP-made ARCOSYSTEM® cable containment system to a bridge. The project took place in the Austrian municipality of St. Georgen near Salzburg. As can be seen amongst the images below, the high railway...
by Paul Gadsby | Sep 1, 2025 | ARCOsystem
Some careful design and planning work allowed for a successful attachment of our ARCOSYSTEM® cable troughing to a steel railway bridge. The project took place on a lengthy bridge over the River Lesum near the city of Bremen in northern Germany. Following the...
by Paul Gadsby | Feb 17, 2025 | ARCOsystem
Multiple troughs of our versatile cable containment product ARCOSYSTEM® were stacked vertically to meet the demanding cable-load requirements for a recent installation in Berlin. The job took place in the area of Pölnitzweg, based in the Pankow district of the German...
by Paul Gadsby | Sep 16, 2024 | ARCOsystem
Our ARCOSYSTEM® elevated cable troughing was successfully installed in order to power Track Paralleling Huts during a rail project in the south east of England. Earlier this year, AW Rail Services Ltd were contracted to support ongoing works in the Sussex and Kent...
by Paul Gadsby | Sep 2, 2024 | ARCOsystem
Our cable containment product ARCOSYSTEM® was successfully installed along a highway bridge as part of an important reinforcement job in the Netherlands. The project took place on the A7 Neckerstraat bridge in the city of Purmerend to the north of Amsterdam. Size 2 of...
by Paul Gadsby | Aug 1, 2024 | ARCOsystem, case studies
The versatility of our rail cabling containment product ARCOSYSTEM® was put to the test when it was fitted down a steep incline within the dramatic setting of the Black Forest mountain range in Germany. The installation took place around the picturesque town of...